property:development:construction:specifications:home

Property:Development:Construction:Specifications

Summary

The following are Specifications specific to Construction on properties.

  • TBD
  • Groundwork:
    • Pad must have perimeter drainage.
  • Entrances:
    • Coats must not be visible outside of house. Provide an aerated deep cupboard to put coats, even if wet.
      • Must Not provide just a coat-rack or hooks (bulky coats are visible from many angles, through windows, and create a messy first impression of the residence, even from outside, looking at the house).
      • Shoes/boots must out of view in the entrance way. Provide a window seat shelf, and ground stop bar, under and behind which which they can be placed out of the way.
      • If the same entrance cannot be shared between primary and secondary spaces, a second, simpler, external entrance must be provided directly to wing primary space (playroom).

      * Rooms:

    • The space must provide for 3 rooms, separated in two zones: a master bedroom + child bedroom on one side of the house, a bedroom and a teen social/play in a secondary zone.
  • Bathrooms:
    • Must provide two bathrooms: one on either wing. The second bathroom makes the guest wing independent, usable by returning teens, or boarders taken in to pay higher mortgages.
  • Kitchen:
    • The kitchen must have a dining room facing 110cm deep counter (not just facing the wall).
    • The kitchen counter must provide an external 40cm recess for either stools or cabinetry (eg: wine storage and display)
    • The oven, and accompanying venting must be against a wall (vents are more or less useless when open on 4 sides).
      • The range must be gas based.
        • Would require excessive solar panels.
      • The stove should be electrical. Note this will impact solar panel requirements.

      * living room:

    • Must be continuous with dining room.
    • Must be at least 5 x 6 m
  • Dining room:
  • Bedrooms:
  • Electrical:
  • Plumbing:
  • Fixtures:
  • Interior Finish:
  • Flooring:
  • Landscaping:
  • Driveway:
  • TBD
  • The ground should be formed for drainage before any gravel is laid down.

TBD

If pouring a foundation, remember to consider: * Sandbox for draining tubs that can be post-finished (allows for location adjustment) 1) * Don't forget drainage of AC unit!2) * Kitchen:

  • cold water supply for fridge (icecubes)
  • hot/cold for sink
  • sink drain

* Bathroom

  • hot/cost for sink
  • hot/cold for shower
  • hot/cold for bath
  • floor drain
  • sink drain
  • shower drain
  • bath drain

Specifications to keep in mind include:

  • TBD.

Specifications to keep in mind include:

  • TBD.
  • TBD
  • TBD

Specifications to keep in mind include:

  • TBD.

Specifications to consider include the following:

  • TBD

Specifications to consider include the following:

  • TBD
  • TBD
  • For modularity objectives, ensure electrical circuits necessary for downlights for each space are in place beforehand.
  • For safety objectives, ensure all downlights produce low temperatures (use more lights rather than needing more powerful lights).
  • For safety objectives, avoid needing lights in cupboards than may be left on and forgotten, building up excessive heat.
  • For resource objectives, ensure placement of hvac vents system is considered beforehand.
  • For resource objectives, ensure bathroom ventilation is considered beforehand.
  • For resource objectives, ensure laundry ventilation is considered beforehand.
  • For resource objectives, ensure kitchen ventilation is considered beforehand.
  • TBD
  • TBD
  • TBD